SUBSCRIBE to our eNews and SCOPE Newsletter

 

Read earlier SCOPE and eNews editions.

Process & contact

 

Kemira iron / aluminium phosphate

Member of ESPP

www.kemira.com

Contact 17kemira2

Updated 11/2021

Input materials

Upgrading of existing sewage treatment works

Output products

 Iron or aluminium phosphate

 17kemiraProcess description

1) Optimisation of primary and secondary (biological) treatment by polymer dosing with control algorithms giving increased biogas production

2) Tertiary P-removal with iron and/or aluminium coagulants, control algorithms, separation by settling and/or centrifugation to produce a P-rich sludge, <10% C-org, containing >50% of WWTP incoming P. Can be installed at smaller WWTPs and recovered material treated at centralized treatment process.

3) Optionally further processing of the P-rich sludge, by drying, granulation, or separation of P and Fe or Al to produce phosphoric acid, phosphate salt and Fe or Al coagulant for water treatment

Operating status

 Tested at full scale at two WWTPs (63,000 pe and 130,000 pe) for 1-7 months, and at pilot scale at three WWTPs for 2-3 months.17kemira3

Iron phosphate granules have been tested as fertiliser in pot trials with rye grass.

Photos: NPK fertilizer granules including iron phosphate (left). Recovered aluminium phosphate pellets (right). Pilot set up for P-rich sludge separation in tertiary unit (bottom).

SUBSCRIBE to our eNews and SCOPE Newsletter

 

Read earlier SCOPE and eNews editions.